Before installing the floor, it is necessary to accurately measure the paving area of the room in order to be aware of the material loss during the entire paving process.
2. Grassroots treatment
The first step before the floor is formally laid is the grassroots treatment, which is mainly to repair the problem ground to form a new base layer to avoid the arching of the floor due to the hollow and cracks of the original base layer. After the base layer is completed, the ground needs to be leveled. If the ground is uneven, not only will the skirting line have gaps, the overall floor will also be uneven, and there will be abnormal noises, which will seriously affect the quality of the floor.
3. Leveling the ground
The level error of the ground cannot exceed 2mm, if it exceeds, find a way to level it. If the ground is uneven, not only will the skirting line have gaps, the overall floor will also be uneven, and there will be abnormal noises, which will seriously affect the quality of the floor.
Our company's business includes: LVT flooring, SPC vinyl flooring, loose flooring, LVP flooring, hardcore vinyl flooring, PVC vinyl flooring. If necessary, please contact us.